Bathroom Remodeling

A bathroom is a small room where the parts you cannot see decide how long it lasts.

Bathroom with a freestanding tub and stone surfaces

Bathrooms fail from the inside out. Tile looks the same on day one whether or not there is a proper waterproofing assembly behind it; the difference shows up years later as a soft floor or a stain on a ceiling below. The work worth paying attention to is under the surface.

We plan the substrate, the waterproofing, the slope and the ventilation as part of the design rather than treating them as details to sort out on site. Shower drains, curbless entries and niche placement all depend on framing decisions made before tile is ordered.

Because the room is small, sequencing matters more than it seems. There is rarely space for two trades at once, so the schedule is built around clean handoffs.

Ventilation is not optional in a desert. A shower produces the same moisture in Phoenix as anywhere else, and an exhaust fan that dumps it into the attic instead of outside is quietly feeding the one environment where that moisture does damage. Sizing the fan to the room, routing it to the exterior and switching it so it actually runs are small design decisions with a long tail.

A remodel is also the cheapest moment this room will ever offer to plan for the future: solid backing in the walls for grab bars whether or not bars are installed now, a curbless entry where the structure allows it, valve heights and clearances chosen deliberately. None of it reads as medical, and all of it is nearly free while the walls are open.

Bathroom with dark tile and a freestanding tub
Bathroom with a glass shower enclosure and tiled walls

What we coordinate

  • Bathroom layout and construction details
  • Licensed plumbing and electrical trades
  • Waterproofing assembly and shower slope
  • Tile setting and grout
  • Vanity, fixture and hardware installation
  • Shower glass templating and installation
  • Exhaust ventilation sized for the room

How the project runs

Typical major phases.

  1. 01

    Consultation and measure

    What is failing, what you want to change, and what the room can accommodate.

  2. 02

    Design and selections

    Layout, fixtures, tile and glass resolved together — a curbless shower is a framing decision, not a finish decision.

  3. 03

    Permitting where required

    Relocating fixtures or altering venting typically requires a permit.

  4. 04

    Demolition and rough-in

    Removal down to studs where needed, plumbing and electrical rough-in, framing adjustments, inspection.

  5. 05

    Waterproofing and tile

    Substrate, waterproofing assembly, slope to drain, then tile and grout.

  6. 06

    Fixtures, glass and walkthrough

    Vanity, fixtures, glass measured after tile, then punch list.

Phases describe sequence, not schedule. We do not publish durations for work that has not been scoped, and permit review times belong to the jurisdiction.

Design & preconstruction

What gets decided before we build.

  • Whether a curbless shower is achievable given the floor structure
  • Where the drain can move, and what that requires below the floor
  • Ventilation routed to the exterior rather than into an attic
  • Clearances required around fixtures
  • Glass is templated after tile, so it lands late in the schedule by nature

What moves the cost

Why two similar projects can cost very differently.

These are the variables that actually move a number. We do not publish price ranges for work that has not been scoped — a real figure comes from your project, not from an average.

Whether fixtures move
A bathroom refinished in place — same toilet, tub and vanity locations — is a finishes project. Relocating any of them, particularly the toilet, means opening the floor to reach the drain and re-establishing the correct fall to the stack. On a slab that means concrete work. This is usually the single largest fork in a bathroom budget.
Waterproofing scope and method
The waterproofing assembly is invisible when finished and is the part that decides whether the room lasts. A standard tub surround, a fully waterproofed shower enclosure and a curbless walk-in are three different scopes with different materials, detailing and labour — and the curbless version usually requires recessing or building up the floor structure so the drain still falls correctly.
Tile size, layout and pattern
Tile price per square foot understates the difference. Large-format tile needs a flatter substrate and more preparation. Mosaics, herringbone and any pattern with a mitred or aligned edge take substantially more labour. Running tile to the ceiling instead of stopping at a standard height changes both material and time.
Shower configuration
A single showerhead on one valve is a different plumbing scope from a system with a rain head, handheld and body sprays — more valves, more supply, and enough demand that the water heater becomes part of the conversation. Frameless glass is templated to the finished opening and priced accordingly.
Ventilation and electrical
Exhaust has to reach the exterior, not an attic, and the routing available decides whether that is simple. Adding heated floors, additional circuits, or lighting inside a wet location brings work that has to be planned before the walls close.
Vanity and storage approach
A stock vanity set against a wall and a custom millwork run with an integrated top are different projects. Double sinks add a second supply and drain set, and often the wall length to support them is what actually constrains the design.

What moves the schedule

What actually consumes the calendar.

We do not publish durations for work that has not been scoped, and permit review times belong to the jurisdiction rather than to us.

The sequence is unusually rigid
A bathroom has less room to resequence than most projects. Rough-in, then inspection, then waterproofing, then tile, then glass templating, then glass. Each step gates the next, so a delay anywhere moves everything after it — one reason a small room can take longer than its size suggests.
Glass is templated after tile
Frameless glass cannot be ordered from drawings; it is measured against the finished opening. That places a fabrication lead time near the end of the project by nature, and no amount of early ordering changes it.
Tile and fixture selections
Tile has to be on site before setting starts, and specialty or imported tile can carry long lead times. Fixtures and valves need to be in hand for rough-in, because the valve body is installed inside the wall.
Whether it is the only bathroom
A single-bathroom household changes the planning, not the construction. Sequencing to minimise the days without a usable bathroom is a scheduling decision made in advance rather than improvised.

Before you commit

Worth understanding first.

Included capabilities

Work commonly included in this project type.

Monarch coordinates the full project scope, with specialty work performed by appropriately licensed trades where required.

Questions

Answers we can give honestly.

Can we get a curbless shower?
Often, but it depends on what is under the floor. A curbless entry needs the drain recessed, which is straightforward with a joist floor and more involved on a concrete slab. We check before it is designed in.
How is the shower waterproofed?
With a proper waterproofing assembly behind the tile, sloped correctly to the drain. Tile and grout are not waterproof on their own. This is the part of a bathroom worth spending on because it is the part that fails.
Why does the glass come so late?
It is templated to the finished tile, not to the drawings, so it is measured after tile is set and then fabricated. It is normal for the shower to be usable before the glass arrives.
Should we swap the tub for a big shower?
It is your call, and it deserves a real conversation rather than a slogan about resale. The honest questions are how the room is used, whether another bathroom in the house keeps a tub, and what the change means for the plumbing and layout. We will lay out what each option involves; the decision stays yours.
How disruptive is a bathroom remodel to the rest of the house?
The room itself is fully out of service for the duration, and the path to it is a work corridor — protected floors, trades moving through, some days of noise and dust. If it is the only bathroom, that is a planning problem to solve before demolition, not during it.

How a project starts

Start with a consultation. We look at the space, talk through what you want to change and what you want to keep, and set out what the design and preconstruction stage would involve for your project.